Project Overview

Elementary school renovation to add air conditioning to the school and update temperature controls.

Our Solution

We installed 40 ductless split systems, three variable refrigerant flow systems, two dedicated outdoor air systems, one rooftop unit, and new temperature controls

<!-- Start of Floodlight Tag: Please do not remove Activity name of this tag: DBM_RobertsonMorrisonInc_09202019_SiteRMSG URL of the webpage where the tag is expected to be placed: This tag must be placed between the and tags, as close as possible to the opening tag. Creation Date: 09/20/2019 -->