Project Overview

Renovated three floors at the One Campus Martius building for a new tenant build out.

Our Solution

We installed twenty-five variable air volume boxes with heating hot water reheat coils, supply and return duct work, heating hot water supply and return piping, and temperature controls.

<!-- Start of Floodlight Tag: Please do not remove Activity name of this tag: DBM_RobertsonMorrisonInc_09202019_SiteRMSG URL of the webpage where the tag is expected to be placed: This tag must be placed between the and tags, as close as possible to the opening tag. Creation Date: 09/20/2019 -->