Project Overview

Renovation of the apron level of the McNamara terminal to add multiple breakrooms for airline pilots and staff.

Our Solution

Thirty-five variable air volume boxes, hot water reheat coils, 10 radiant ceiling panels, heating hot water supply and return piping, ductwork, and temperature controls.